![]() tAttribute("data-client-id", "AX9rMpdgyEiEnIJwVWWR3NGhLd7xmAyclPs08QU1WcG06l5eXQsLi4Pv9inDihhDJhjHZSDMHbpIycZL") Script.id = "paypal-smart-payment-script" Var script = document.createElement("script") Also can make wide working and storage platform.If(!document.getElementById('paypal-smart-payment-script')) ![]() You can flexibly assemble the scaffold fitting to complicated building form. Ledger and transom is possible to attach for 4 directions of each standard flanges. The node holds the ability against vibration and unexpected rising. ![]() The wedge penetrates standard's flange hole and special shaped "Snake Mouth" which is set at both end of ledger. That combination possesses high rigidity. Node and junction of ALBA SYSTEM Strong and Hi-Reliability The nodes of standard and ledger(transom) of ALBA SYSTEM are consisted of pressed plates and white heart malleable cast iron. Light weight, but node possesses high tightening power and durable against frictional wear You don't have to walk through to be bowing your head. Especially at stair case, it is very easy to go up down and returning.Ī lift height of 1800mm makes you free from being tired even in long time working, without stress as well. So you can get wide space as working area and comfortable access. No reinforcer in scaffold internal space. Unfortunately if a person falls, the guardrail deforms and absorbs the shock of fall momentum. The preceding guardrail is available to fastening safety belt. When the scaffolding is disassembled, scaffolders can work to detach the components on top platform where guardrails remain to the last. "0.5" means a unit of guardrail with standards of half height of a tier. In contrast, our new method takes a module of 0.5 ( 0.5th → 1.5th → 2.5th →3.5th・・・). Under the conventional method of erection, scaffold is assembled tier by tier ( platform to platform, for example 1st. That means that you can attach two components and two processes in one. In that way, when worker walks up to top platform, there has been completed the guardrails and he can grip them to keep himself.įurthermore,the Preceding Guardrail possesses the function of cross brace as well. In other word, always worker must operate at the altitudes without any guardrail. But there is nothing before he creates something out. Asked "why does person fall from scaffold?" The answer was that scaffolders have to assemble the components on the top platform of scaffold to erect it upper and upper. However most featured function of ALBATROSS is "Preceding Guardrail Method". From modular scaffold, flexibility of assembling and less volume of the components. The strong points from frame type scaffold is quick, easy, and stability by cross braces. It possesses both advantage of frame type scaffold and modular scaffold. On the other hand, ALBATROSS is designed for "how to make it safer" and "how to make it more efficient" In fact almost of traditional scaffold has been only designed for "how to make it stronger". ![]() The breakthrough, it had not be developed from conventional scaffold but it was born from quite new idea pursuing safety and work performance.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |